Three Phase Upgrade Cost in Sydney: What Affects the Price

What drives the cost of upgrading from single to three phase in Sydney, and how to get a fixed price fast.

4.9 on Google

From 74 reviews · Read them →

✓ 24/7 emergency call-outs

✓ Ausgrid & Endeavour Energy networks

✓ Fixed quote before we start

Get a Free Quote
Fast response — usually within the hour.
Your name *
Phone number *
Suburb / address *
What service do you need? *
Email address
How can we help?
No obligation. We respect your privacy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

What you're paying for

A three-phase upgrade isn't one job. It's a network application, new Level 2 work on your service, a meter change and usually switchboard work. The price depends on how much of each your home needs.

What affects the cost

  • Overhead or underground service. Replacing an overhead service line is usually simpler than replacing an underground cable, especially if the cable run is long or under concrete.
  • Distance to the pole or pillar. Longer runs mean more cable and labour.
  • Consumer mains. If your mains are undersized or old, they need replacing too.
  • Switchboard. An old board, especially an asbestos meter board, usually has to be replaced to take three-phase protection.
  • Metering. A three-phase meter is needed. Your retailer's metering provider usually installs it, and some charge for it.
  • Network requirements. Occasionally the network needs to do work on its side to supply the extra capacity.

How to get an accurate price

Send us photos of your meter box, the point where power enters the house and the street pole or pillar. That's usually enough for a fixed quote, with a site visit only if needed. See our three-phase upgrade service.

Frequently asked questions

Do I need three phase for an EV charger?

Not always. Many chargers run on single phase. Three phase lets you charge faster and run other big loads at the same time. We can check your existing supply first.

How long does a three-phase upgrade take?

The on-site work is often done in a day. The overall timeframe depends mainly on network approval and metering appointments.

Can I get three phase if my street only has single phase?

Most Sydney streets have three-phase low-voltage mains, but not all. The network confirms availability during the application.

Free Quote

Talk to an Accredited Level 2 Electrician

Send us the address and what you need, or a photo of your meter box or notice. We'll call you back with a fixed price. Emergencies: 02 8107 9999, 24/7.

Get a Free Quote
Fast response — usually within the hour.
Your name *
Phone number *
Suburb / address *
What service do you need? *
Email address
How can we help?
No obligation. We respect your privacy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.